Hoover Dam Bridge Image 2
A 1,900-foot span designed to divert traffic from the narrow, switchback-laden road across the Hoover Dam, it will be the longest concrete arch bridge in the Western Hemisphere when it opens next fall, with 106 segments of ultra-high-strength concrete forming a twin-rib arch.